CK-104 LONG LEAD Part by Crl Components Inc with NSN 5910-00-113-5499 - Request a Quote Now

Part Number:  CK-104 LONG LEAD
Manufacturer:  crl components inc
CAGE Code:  71590
NIIN:  001135499
INC Code:  00007
Country:  USA
NCB Code:  00

For competitive procurement options on part number CK-104 LONG LEAD from Crl Components Inc (CAGE Code 71590), look no further than Just Parts Unlimited. With the form presented on this page, you can submit information on your needs to receive tailored procurement solutions from our staff.

Part Number CK-104 LONG LEAD Details:

Part number CK-104 LONG LEAD is manufactured by Crl Components Inc and listed with the item name Capacitor Fixed Ceramic Dielectr. Classified under NSN 5910-00-113-5499, the NIIN of this item is 001135499, its INC is 00007, and its NCB code is 00 (USA).

For organization and identification purposes, this item is listed within the Federal Supply Group (FSG) 59 Electrical and Electronic Equipment Components and Class (FSC) 5910 Capacitors. These details are important for confirming parts before making a purchase.

Note : We Will Not Share Your Information To Any Third Parties.

Please fill out below form for CK-104 LONG LEAD

Contact Information

“*” Required Fields Are Compulsory
   * By clicking this box, I acknowledge that I have read and accept the ASAP Semiconductor Terms and Conditions and agree that all quotes and purchase orders are exclusively subject to the ASAP Semiconductor

Terms and Conditions

  • I consent to receive email communications from ASAP Semiconductor and can unsubscribe at any time.
  • ASAP Semiconductor is a wholly independent aftermarket parts distributor.
  • This website is intended for quotations based on part numbers only. Please DO NOT submit drawings, technical data, or other specifications through this portal.

Disclaimer: This is a quotation for the goods listed above. This quotation is meant as an estimate and does not reflect a final bill or invoice. All quotations are subject to change until acceptance by ASAP Semiconductor of a binding Purchase Order, and quotations may be withdrawn or revised at the sole discretion of ASAP Semiconductor. This quotation is subject to the ASAP Semiconductor Terms & Conditions available at https://www.asapsemi.com/terms-conditions.aspx . All United States Government and Department of Defense bids are quoted as CAGE code 6RE77 from ASAP Semiconductor’s Anaheim, California facility. Any quotation from ASAP Semiconductor without 6RE77 is void.

How to Get Started on Procurement

  1. Complete an RFQ Form: Fill out this form for part CK-104 LONG LEAD with details on your operational requirements, including your target quantity and expected turnaround time.
  2. Wait for a Response: Our staff will quickly review the details you provide and reach out within 15 minutes or less to present options for your comparisons.
  3. Make a Purchase: Once a purchase is made, you can expect our team to work closely with you each step of the way to ensure all needs are addressed.

NSN Information for Part Number CK-104 LONG LEAD with NSN 5910-00-113-5499, 5910001135499

NSNFSCNIINCLSHazmatDEMILCancelled NSN
5910-00-113-5499

Item PartTypeName:

CAPACITOR,FIXED,CERAMIC DIELECTR

59100011354990PA
CIICHCCESDPMICCriticalityENAC
UAA0
Part NumberISCRNVCRNCCHCCMSDSSADC
012207-00131CA

Characteristics Data of NSN 5910-00-113-5499, 5910001135499

MRCCriteriaCharacteristic
AAQLBODY STYLEW/O MTG FACILITIES TERMINAL(S) ON ONE SURFACE
AARGRELIABILITY INDICATORESTABLISHED
AARHRELIABILITY FAILURE RATE LEVEL IN PERCENT0.0010
ABJTTERMINAL LENGTH1.250 INCHES MINIMUM
ADAQBODY LENGTH0.290 INCHES NOMINAL
ADATBODY WIDTH0.290 INCHES NOMINAL
ADAUBODY HEIGHT0.090 INCHES NOMINAL
AEBPCENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO LENGTH0.200 INCHES NOMINAL
AEBTTERMINAL DIAMETER0.025 INCHES NOMINAL
AEBZSCHEMATIC DIAGRAM DESIGNATORNO COMMON OR GROUNDED ELECTRODE(S)
AGAVEND ITEM IDENTIFICATIONMULTIPLE LAUNCH ROCKET SYSTEM (MLRS)
CQBFINSULATION RESISTANCE AT MAXIMUM OPERATING TEMP10000.0 MEGOHMS
CQBQCAPACITANCE VALUE PER SECTION0.100 MICROFARADS SINGLE SECTION
CQFBVOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE-25.0 TO 15.0 WITH RATED VOLTAGE APPLIED SINGLE SECTION
CQJJNONDERATED OPERATING TEMP-55.0 DEG CELSIUS MINIMUM AND 125.0 DEG CELSIUS MAXIMUM
CQWMNONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION100.0 DC SINGLE SECTION
CRTPTOLERANCE RANGE PER SECTION-10.00 TO 10.00 PERCENT SINGLE SECTION
CWJKCASE MATERIALPLASTIC
CWPKINSULATION RESISTANCE AT REFERENCE TEMP100000.0 MEGOHMS
CWPMDISSIPATION FACTOR AT REFERENCE TEMP IN PERCENT2.5000
CWSGTERMINAL SURFACE TREATMENTSOLDER
NHCFNUCLEAR HARDNESS CRITICAL FEATUREHARDENED
TESTTEST DATA DOCUMENT81349-MIL-C-39014 SPECIFICATION (INCLUDES ENGINEERING TYPE BULLETINS,BROCHURES,ETC.,THAT REFLECT SPECIFICATION TYPE DATA IN SPECIFICATION FORMAT; EXCLUDES COMMERCIAL CATALOGS,INDUSTRY DIRECTORIES,AND SIMILAR TRADE PUBLICATIONS,REFLECTI
TTQYTERMINAL TYPE AND QUANTITY2 UNINSULATED WIRE LEAD
ZZZKSPECIFICATION/STANDARD DATA81349-MIL-C-39014/2 GOVERNMENT SPECIFICATION



Thank you for visiting Just Parts Unlimited!

Thank You for Visiting! You Can Download the ASAP Semiconductor App On the Google Play Store and App Store to Get Updates On All of Our Latest Deals and Newest Parts.

Request for Quote

We use cookies to ensure that we give you the amazing experience on our website. If you continue to use this site we will assume that you are happy with it.

bottom to top