For competitive procurement options on part number DD101 LONG LEAD from Crl Components Inc (CAGE Code 71590), look no further than Just Parts Unlimited. With the form presented on this page, you can submit information on your needs to receive tailored procurement solutions from our staff.
Part Number DD101 LONG LEAD Details:
Part number DD101 LONG LEAD is manufactured by Crl Components Inc and listed with the item name Capacitor Fixed Ceramic Dielectr. Classified under NSN 5910-00-678-8157, the NIIN of this item is 006788157, its INC is 00007, and its NCB code is 00 (USA).
For organization and identification purposes, this item is listed within the Federal Supply Group (FSG) 59 Electrical and Electronic Equipment Components and Class (FSC) 5910 Capacitors. These details are important for confirming parts before making a purchase.
Disclaimer: This is a quotation for the goods listed above. This quotation is meant as an estimate and does not reflect a final bill or invoice. All quotations are subject to change until acceptance by ASAP Semiconductor of a binding Purchase Order, and quotations may be withdrawn or revised at the sole discretion of ASAP Semiconductor. This quotation is subject to the ASAP Semiconductor Terms & Conditions available at https://www.asapsemi.com/terms-conditions.aspx . All United States Government and Department of Defense bids are quoted as CAGE code 6RE77 from ASAP Semiconductor’s Anaheim, California facility. Any quotation from ASAP Semiconductor without 6RE77 is void.
How to Get Started on Procurement
NSN | FSC | NIIN | CLS | Hazmat | DEMIL | Cancelled NSN |
---|---|---|---|---|---|---|
5910-00-678-8157 Item PartTypeName: CAPACITOR,FIXED,CERAMIC DIELECTR | 5910 | 006788157 | 0 | P | ||
CIIC | HCC | ESD | PMIC | Criticality | ENAC | |
U | A | 0 | ||||
Part Number | ISC | RNVC | RNCC | HCC | MSDS | SADC |
002-1024 | 3 | 9 | 5 |
MRC | Criteria | Characteristic |
---|---|---|
AAQL | BODY STYLE | W/O MTG FACILITIES,RADIAL TERMINALS |
AARG | RELIABILITY INDICATOR | NOT ESTABLISHED |
ABJT | TERMINAL LENGTH | 1.500 INCHES MINIMUM |
ABPM | BODY DIAMETER | 0.290 INCHES MAXIMUM |
ADAQ | BODY LENGTH | 0.156 INCHES MAXIMUM |
AEBS | CENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO DIAMETER | 0.250 INCHES NOMINAL |
AEBT | TERMINAL DIAMETER | 0.025 INCHES NOMINAL |
AEBZ | SCHEMATIC DIAGRAM DESIGNATOR | NO COMMON OR GROUNDED ELECTRODE(S) |
AGAV | END ITEM IDENTIFICATION | MISSILE,AI-TO-AIR,PHOEBNIX (AIM-54); TELETYPE,MODEL 28; TEST CONSOLES,MINI-SACE; ENGINE,AIRCRAFT TF33-PW-102 (C-135E,EC-135H/K/P); MISSILE,AIR-TO-AIR,SPARROW (AIM-7); SUPPORT EQUIPMENT,MX PEACEKEEPER MISSILE; SUPPORT EQUIPMENT,B |
CQWM | NONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION | 1000.0 DC SINGLE SECTION |
CQBQ | CAPACITANCE VALUE PER SECTION | 100.000 PICOFARADS SINGLE SECTION |
CQFB | VOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE | -56.0 TO 22.0 WITHOUT VOLTAGE APPLIED SINGLE SECTION |
CQJJ | NONDERATED OPERATING TEMP | -55.0 DEG CELSIUS MINIMUM AND 85.0 DEG CELSIUS MAXIMUM |
CRTL | CRITICALITY CODE JUSTIFICATION | FEAT |
CRTP | TOLERANCE RANGE PER SECTION | -10.00 TO 10.00 PERCENT SINGLE SECTION |
CWJK | CASE MATERIAL | PLASTIC |
CWPK | INSULATION RESISTANCE AT REFERENCE TEMP | 10000.0 MEGOHMS |
CWSG | TERMINAL SURFACE TREATMENT | SOLDER |
FEAT | SPECIAL FEATURES | WEAPON SYSTEM ESSENTIAL |
TTQY | TERMINAL TYPE AND QUANTITY | 2 UNINSULATED WIRE LEAD |
Guaranteed on-time delivery. |
|
Over 5100 manufacturers |
|
Customized and user-friendly database |
|
Complete purchasing solutions |
Thank You for Visiting! You Can Download the ASAP Semiconductor App On the Google Play Store and App Store to Get Updates On All of Our Latest Deals and Newest Parts.
Request for Quote